3
May
2013
İSTANBUL NEW AIRPORT
Tender for İstanbul New Airport carried out in Ankara. The Joint Venture formed by İGA investors won the tender with a bid worth €22.152 billion + VAT.
10
July
2013
FOUNDATION OF İGA
İGA Airport Operations was founded
19
November
2013
AGREEMENT SIGNED
The agreement between the Joint Venture and the state was signed on the 80th anniversary of the foundation of DHMI
7
June
2014
GROUNDBREAKING FOR İSTANBUL NEW AIRPORT
A groundbreaking ceremony for İstanbul’s New Airport was held.
21
January
2015
DUTY FREE AGREEMENT
İGA and Unifree DutyFree signed the world’s biggest duty free deal for a period of 25 years.
4
June
2015
OPERATIONS CONSULTANCY AGREEMENT
İGA signed an Operations Consultancy Services Agreement with Seul Incheon International Airport Corporation and Copenhagen Airports International.
19
October
2015
4.5 BILLION LOAN AGREEMENT
İGA signed a loan agreement worth €4.5 billion with Ziraat Bank, Halkbank, VakıfBank, DenizBank, Garanti Bank and Finansbank to finance the first phase of Istanbul New Airport. Participants at the ceremony included President Recep Tayyip Erdoğan, Prime Minister Ahmet Davutoğlu, numerous senior bureaucrats, İGA Board members, and senior managers of creditor banks.
8
January
2016
THE FIRST PART OF THE SPACE FRAME ROOF OF THE İSTANBUL NEW AIRPORT IN PLACE
Installation of the first part of İstanbul New Airport piers' space frame roof is now underway. Construction continues at full speed in the terminal building of the Istanbul New Airport, which, when completed, will become the largest airport in the world 'built from scratch'. The roof of the structure, which spans 145,000 square meters excluding the roof of the terminal building pier, is designed as a space frame model. In this regard, the first phase of the work is focused on a 5,000-sqm part of the roof, approximately 1,000-sqm of which is already completed.
26
October
2010
İSTANBUL NEW AIRPORT ATC TOWER BREAKS GROUND
Ahmet Arslan, Minister of Transport, Maritime and Communication, inaugurated the groundbreaking ceremony of İstanbul New Airport’s Air Traffic Control Tower designed by Pininfarina and AECOM. The tower, winner of the 2016 International Architecture Award, will be 90-meter-tall and completed in 2017.
8
December
2017
BAGGAGE SYSTEM OF İSTANBUL NEW AIRPORT IS COMPLETED
Conveyor installation of 42 km-long luggage system is completed and ready for the opening.
28
February
2018
FIRST RUNWAY ARE ON
3.750 meter-long and 60 meter-wide, the first runway is completed and its lights are on at İstanbul New Airport.